Direct answer: each approved eco-organisation publishes its own 2026 fee schedule, in €/kg, €/tonne, €/m³ or €/unit depending on the product family. The tables below give the full schedule for Valdelia, Ecomaison and Ecominéro, and an extract of Valobat's, which runs to more than 500 lines; each table carries its unit, its date of application and links to the official schedule. These schedules cannot be read line by line from one eco-organisation to another: the taxonomies do not overlap and the units differ — the same product may be priced per kilo by one and per m³ or per unit by another. Where two of them price the same product in the same unit, the gap is shown on our comparison page, item by item. Fees are provisional. These fees changed on 1 July and 1 August 2026, and will change again with the reform on 1 January 2027.
| Family | €/kg | Reduction (example) |
|---|---|---|
| Engineered wood (glued/reconstituted) | 0.10 | — |
| Wood joinery | 0.17 | — |
| Plastic joinery | 0.15 | — |
| Metal — over 50% by mass (excluding joinery) | 0.09 | — |
| Metal — over 95% by mass (excluding joinery) | 0.09 | — |
| Plaster | 0.05 | — |
| Glass / rock wool | 0.08 | 0.076 if ≥ 50% post-consumer recycled fibres |
| Rigid PVC | 0.06 | 0.057 if ≥ 10% recycled + < 0.1% hazardous substances |
| Raw wood | 0.03 | — |
| Water-repellent wood | 0.10 | — |
| Mortars, renders, paints, varnishes, resins | 0.28 | — |
| Metal joinery | 0.14 | — |
| Flexible PVC | 0.03 | — |
| EPS (expanded polystyrene) | 0.04 | — |
| Rigid plastic | 0.09 | — |
| Polyurethane | 0.09 | — |
| Bitumen | 0.08 | — |
| Other (cat. 2) | 0.30 | — |
Source: Valdelia — PMCB S2 2026 schedule (PDF). Free membership, quarterly declaration. Full schedule and reductions: see the official PDF.
| Family | Fee | Unit / variants |
|---|---|---|
| Aggregates | 0.40 | €/tonne (0.36 recycled) |
| Ready-mixed concrete (RMC) | 3.02 | €/m³ (R0 2.88 · R1 2.27 · R2–R7 1.51) |
| Cement | 10.26 | €/tonne (CEM II 9.23) |
| Concrete blocks | 1.19 | €/tonne (R0 1.13 · R1 0.90) |
| Fired clay | 1.35 | €/tonne (0.65 if ≥ 10% clay waste) |
| Bituminous products | 0.68 | €/tonne |
Source: Ecominéro — eco-contribution schedule 01/08/2026 (PDF). Monthly declaration.
The Valobat 2026 schedule (official version of 2 June 2026, applicable 1 July 2026) covers both categories over more than 500 product lines. We reproduce only a few verified benchmarks here; the full schedule is the official file.
| Product | Fee | Category / unit |
|---|---|---|
| Ready-mixed concrete | 2.40 | cat. 1 · €/m³ |
| Cement | 7.70 | cat. 1 · €/tonne |
| Window (excluding roof windows) | 5.57 | cat. 2 · €/unit |
| External door | 4.05 | cat. 2 · €/unit |
Source: Valobat — PMCB 2026 schedule (official Excel "BaremePMCB2026_02062026_VDEF"). Valobat-specific feature: "recycling-disruptor" penalties (higher fee) on some category-2 families — a mechanism absent from the other three schedules.
Because it runs to more than 500 lines, and a selective, sourced and dated table is more readable, more citable and easier to maintain than a wall of data. For completeness, we link to the official Valobat file.
No, they are provisional. They changed on 1 July and 1 August 2026 and will change with the scheme's reform on 1 January 2027 (new approvals, "mature"/"non-mature" materials, 9 months' notice).
Each eco-organisation prices by product family: €/kg, €/tonne, €/m³ or €/unit. Comparing two eco-organisations on the same product therefore requires a conversion assumption (weight or volume), shown in our comparator.