Direct answer: each approved eco-organisation publishes its own 2026 fee schedule, in €/kg, €/tonne, €/m³ or €/unit depending on the product family. The tables below give the full schedule for Valdelia, Ecomaison and Ecominéro, and an extract of Valobat's, which runs to more than 500 lines; each table carries its unit, its date of application and links to the official schedule. These schedules cannot be read line by line from one eco-organisation to another: the taxonomies do not overlap and the units differ — the same product may be priced per kilo by one and per m³ or per unit by another. Where two of them price the same product in the same unit, the gap is shown on our comparison page, item by item. Fees are provisional. These fees changed on 1 July and 1 August 2026, and will change again with the reform on 1 January 2027.

All values below are indicative and provisional, exclusive of conditional reductions. Units differ between eco-organisations and families: a direct comparison requires a stated conversion assumption (weight or volume of your products) — see the comparator.

Category 2 — Valdelia (S2 2026 schedule, €/kg)

Key families · applicable 1 July 2026 · unit: €/kg
Family€/kgReduction (example)
Engineered wood (glued/reconstituted)0.10—
Wood joinery0.17—
Plastic joinery0.15—
Metal — over 50% by mass (excluding joinery)0.09—
Metal — over 95% by mass (excluding joinery)0.09—
Plaster0.05—
Glass / rock wool0.080.076 if ≥ 50% post-consumer recycled fibres
Rigid PVC0.060.057 if ≥ 10% recycled + < 0.1% hazardous substances
Raw wood0.03—
Water-repellent wood0.10—
Mortars, renders, paints, varnishes, resins0.28—
Metal joinery0.14—
Flexible PVC0.03—
EPS (expanded polystyrene)0.04—
Rigid plastic0.09—
Polyurethane0.09—
Bitumen0.08—
Other (cat. 2)0.30—

Source: Valdelia — PMCB S2 2026 schedule (PDF). Free membership, quarterly declaration. Full schedule and reductions: see the official PDF.

Category 1 — Ecominéro (mixed units)

Key families · applicable 1 August 2026
FamilyFeeUnit / variants
Aggregates0.40€/tonne (0.36 recycled)
Ready-mixed concrete (RMC)3.02€/m³ (R0 2.88 · R1 2.27 · R2–R7 1.51)
Cement10.26€/tonne (CEM II 9.23)
Concrete blocks1.19€/tonne (R0 1.13 · R1 0.90)
Fired clay1.35€/tonne (0.65 if ≥ 10% clay waste)
Bituminous products0.68€/tonne

Source: Ecominéro — eco-contribution schedule 01/08/2026 (PDF). Monthly declaration.

Categories 1 and 2 — Valobat (official schedule, 500+ lines)

The Valobat 2026 schedule (official version of 2 June 2026, applicable 1 July 2026) covers both categories over more than 500 product lines. We reproduce only a few verified benchmarks here; the full schedule is the official file.

Verified benchmarks · applicable 1 July 2026
ProductFeeCategory / unit
Ready-mixed concrete2.40cat. 1 · €/m³
Cement7.70cat. 1 · €/tonne
Window (excluding roof windows)5.57cat. 2 · €/unit
External door4.05cat. 2 · €/unit

Source: Valobat — PMCB 2026 schedule (official Excel "BaremePMCB2026_02062026_VDEF"). Valobat-specific feature: "recycling-disruptor" penalties (higher fee) on some category-2 families — a mechanism absent from the other three schedules.

Point to watch — Ecomaison approval. Ecomaison documents mention an approval ending on 31/12/2026, whereas the ADEME fact sheet indicates 31/12/2027. We flag this discrepancy without settling it: to be confirmed against the official sources below, all the more so as the scheme's reform (new approvals from 1 January 2027) reshapes everything.

Frequently asked questions

Why don't you publish the full Valobat schedule?

Because it runs to more than 500 lines, and a selective, sourced and dated table is more readable, more citable and easier to maintain than a wall of data. For completeness, we link to the official Valobat file.

Are the 2026 fees final?

No, they are provisional. They changed on 1 July and 1 August 2026 and will change with the scheme's reform on 1 January 2027 (new approvals, "mature"/"non-mature" materials, 9 months' notice).

Why aren't the units the same?

Each eco-organisation prices by product family: €/kg, €/tonne, €/m³ or €/unit. Comparing two eco-organisations on the same product therefore requires a conversion assumption (weight or volume), shown in our comparator.

Official sources, data verified on 8 August 2026: Valdelia (S2 2026) · Ecomaison (cat. 2, 01/07/2026) · Ecominéro (01/08/2026) · Valobat (02/06/2026) · ADEME — PMCB scheme (approvals)
Fees are indicative and provisional — a reform is announced for 1 January 2027.
Informational content, neutral. Values are indicative and provisional, selective — refer to the linked official schedules. Neither legal nor tax advice. Published by REP·Pro — support@rep-pro.fr. · Version française